Project: N524JL/N87JL   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Jeremy Leonard   -  
Project:   Vans - RV-7A   -   VIEW REPORTS
Total Hours:1074
Total Flight Time:
Start/Last Date:Mar 17, 2021 - No Finish Date
Engine:Lycoming IO360M1B
Propeller:Sensenich 3 Blade Composite Ground Adjustable/Fixed pitch
Panel:Garmin G3XTOUCH/GNX375/G5/GTR200/GFC507
 
Friendly URL: https://eaabuilderslog.org?s=N524JL/N87JL

Home or Last Project Picture

Jul 28, 2022     Wing wire conduit fab - (4.5 hours)       Category: Wings
I have decided to use PVC conduit in each wing to run the wiring for the wing tips, pitot heat, etc. So I have to find a way to run and secure the conduit. What better way to do this than what's in AC 43 for certified aircraft? Is it the lightest and quickest way? No, but it's a proven way. Anyway, I am am riveting a small lightweight 1/8” thick piece of angle to the main wing rib and securing an adel clamp to that with proper AN3 hardware. It is insanely strong and secure. Two 470 rivets to secure the angle will suffice.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.